With a sharp focus on reaching low carbon emission goals, Mid Devon District Council awarded Space Engineering the contract to replace the gas boilers, at Exe Valley Leisure Centre.
The boilers were replaced with a new heating system which combined Ground Source and Air Source Heat Pumps. Heat pumps are highly energy efficient and can reduce CO2 emissions by up to 70% compared to gas boilers. They also play a major role in improving air quality as gas combustion accounts for up to 40% of nitrogen oxide (NOx) emissions.
The facility needed to remain up and running a during the project period so, working closely with the principal design team and the client, a sensible and achievable programme of works was formulated.
The two existing gas fired boilers were replaced with 5no Air Source Heat Pumps and 4no Ground Source Heat Pumps. Boiler No1. was temporarily retained for the changeover, to ensure services were maintained for the site for the duration of the works. All associated items were carefully and logically removed, including Air Handling Units, pipework (that couldn’t be retained and adapted), flues, wiring, control circuits, main pool heat exchangers and radiators.
The Ground Source Heat Pump scheme was designed as the primary source for heating and hot water on site. Utilising a new boarhole and ground loop array, from the manifold, a pair of flow and return pipes were installed into the plant room. These were fitted with reducer pieces, and purge points (for quick fill, flushing and deaerating). The new ‘free cooling’ circuit system was served by a glycol tank, Microfill pressurisation unit and the associated expansion vessel.
Space Engineering installed 4off Mitsubishi Ecodan Monobloc CRHV-P600YA-HPB 60kW ground source heat pumps, which were connected to the ground loop, heating circuit and cooling circuit. Each heat pump can be individually controlled and modulated, with the individual controls interfacing with the BMS system – allowing all of the units to be cascaded.
5off Mitsubishi Ecodan CAHV-P500YB-HPB 43kW Air Source Heat Pumps were also installed, to support the GSHP configuration. These were located in a new ASHP compound, also installed by Space Engineering.
Other key features within the scope of works were:
There were a number of challenges, during the installation process, with multiple variations but, working with all the stake holders, we were able to commission and hand over within the allotted time frame. This was completed with minimal impact on the ‘live’ site.
As part of a £1.8m investment, one of the UK's leading food processors engaged with Space to design, supply and install refrigeration equipment for a...
Read moreAs part of a competitive tender process, Space Engineering successfully secured the multi phased upgrade works for an existing M&S retail site in Fosse Park....
Read moreOur valued customer needed to replace their high GWP refrigeration equipment for their picking freezer. As Space Engineering understand our clients needs, factoring both CAPEX...
Read moreWe’d love to hear from you. Please enter your details in the form below and we will get back to you.
We take your privacy seriously. We will keep your data safe and we won’t pass it on to any third parties.
Please see our privacy policy for more details.